Article in the 'KE Next' Magazine

"Energy Generation without Leakage in the Swiss Alps"

STAUFF Werdohl

Germany

Head Office STAUFF Germany

Walter Stauffenberg GmbH & Co. KG

Im Ehrenfeld 4
58791 Werdohl

11.05.2022
Published Articles

Only two years after commissioning, leaks were found on the hydraulic stainless steel tubes in one of Europe‘s largest pumped storage plants in the Swiss Alps.

The reason: Conventional stainless steel cutting ring fittings had not been able to withstand the strong vibrations in some of the exposed areas of the power plant.

Kraftwerke Linth-Limmern AG now relies on the tube forming system from STAUFF.

STAUFF Online Page-Flip Content
Navigate and search content, forward via email, print, and download in PDF format
PDF
en
Energy Generation without Leakage in the Swiss Alps
Article in the 2/2022 Issue of the German Trade Magazine 'KE Next'
12,89 mb
PDF
de
Energieerzeugung ohne Leckage in den Schweizer Bergen
Fachbeitrag in der Ausgabe 2/2022 des deutschen Fachmagazins 'KE Next'
4,91 mb
EditMenuCloseResetCheckSpinnerFiltersCart