Pre-Assembly Saves Time

Article in the 'O+P Fluidtechnik' Magazine

STAUFF Werdohl

Deutschland

Hauptsitz STAUFF Deutschland

Walter Stauffenberg GmbH & Co. KG

Im Ehrenfeld 4
58791 Werdohl

10.07.2024
Published Articles

Assembly errors are the most common cause of leaking tube connectors. The simpler their assembly and maintenance, the better hydraulic line systems are protected against leaks.

STAUFF has now optimised its portable pre-assembly machine for 24° cutting ring fittings and is launching a new unit for manual pre-assembly.

Both new products go hand in hand with simplifying handling and thus further increasing leak safety.

O+P
STAUFF Online Page-Flip Content
Navigate and search content, forward via email, print, and download in PDF format
PDF
en
Pre-Assembly Saves Time
Article in the 7-8/2024 Issue of the German Trade Magazine 'O+P Fluidtechnik'
0,59 mb
PDF
de
Vormontage spart Zeit
Beitrag in der Ausgabe 7-8/2024 des deutschen Fachmagazins 'O+P Fluidtechnik'
4,22 mb
EditMenuCloseResetCheckSpinnerFiltersCart