Deutschland
Hauptsitz STAUFF Deutschland
Walter Stauffenberg GmbH & Co. KG
Im Ehrenfeld 4
58791 Werdohl
10.07.2024
Assembly errors are the most common cause of leaking tube connectors. The simpler their assembly and maintenance, the better hydraulic line systems are protected against leaks.
STAUFF has now optimised its portable pre-assembly machine for 24° cutting ring fittings and is launching a new unit for manual pre-assembly.
Both new products go hand in hand with simplifying handling and thus further increasing leak safety.
PDF
en
Pre-Assembly Saves Time
0,59 mb
Article in the 7-8/2024 Issue of the German Trade Magazine 'O+P Fluidtechnik'
PDF
de
Vormontage spart Zeit
4,22 mb
Beitrag in der Ausgabe 7-8/2024 des deutschen Fachmagazins 'O+P Fluidtechnik'